Search: -1223, Facilities Services
Results
The Met Â鶹ÊÓƵ High School’s Roof Remodel
Project Info:
The Met Â鶹ÊÓƵ High School’s roof was removed down to plywood, and replaced with a new roof system. (Funded By Bond Measure Q-Completed Summer of 2018)
Project Status:
O.W. Erlwine Elementary’s Curb Wall/Roof Remodel
Project Info:
The playground got a new seat wall built to enclose the play structure area, and provide additional seating for the kids while they are playing. (Funded By Bond Measure Q-Completed Summer of 2018)
The roof was removed down to plywood, and replaced with a new roof system. (Funded By Bond Measure Q-Completed Summer of 2018)
Project Status:
Completed
A.M. Winn K-8 School’s Asphalt
Project Info:
A.M. Winn’s asphalt was removed and replaced. (Funded By Bond Measure Q-Completed Summer of 2018)
Project Status:
Completed
Hiram Johnson High School’s New Field
Project Info:
Hiram Johnson playfield and track were replaced. Football, Soccer, and Track will be able to be played on the new field. (Funded By Bond Measure Q-Completed Summer of 2018)
Project Status:
Completed
Woodbine Elementary School’s Plumbing
Project Info:
Woodbine Elementary boy’s restroom was remodeled with a new layout. (Funded By Bond Measure Q-Completed Summer of 2018)
Project Status:
Completed
Ethel Philips Elementary School’s Restroom Remodel
Project Info:
Ethel Phillips got a restroom remodeled. (Funded By Bond Measure Q-Completed Summer of 2018)
Project Status:
Completed
C.K. McClatchy High School’s Tennis Courts
Project Info:
C.K. McClatchy’s tennis courts were resurfaced. (Funded By Bond Measure Q-Completed Summer of 2018)
Project Status:
Completed
Â鶹ÊÓƵ High AC Paving at East Parking Lot
Start Date: May 10, 2015
Target Date: August 28, 2015
Project Info:
- Project Manager: Anthony Lea; (916) 264-4075 Ext: 3616
- Architect: HMR
- Contractor: XL Construction
- Funding Source: Emergency Repair Program
Construction Description: Paving at East parking lot
Rosemont High School Track & Field Project
Completion Date: April 2014
Project Info:
- Project Manager: Lori Rubenstein
- Architect: HMC Architects
- Contractor: Landmark Construction
- Funding Source: Measure R
Construction Description: Track & Field Replacement
John F. Kennedy High School Track & Field Project
Completion Date: September 2, 2014
Project Info:
- Project Manager: Lori Rubenstein
- Architect: HMC Architects
- Contractor: Landmark Construction
- Funding Source: Measure R
Construction Description: Track & Field replacement